. Non-Excavation Underground Tank Repair in Nigeria: The Technology That Saves Filling Stations Millions

 

Introduction

When an underground storage tank fails, whether through corrosion, pinholes, stress fractures, or joint failures,  the traditional response is also the most expensive and disruptive one: full excavation.

Excavation means: removing the canopy, breaking up the concrete forecourt, digging down to the tank level, extracting the old tank, installing the new one, backfilling, and reconstructing the forecourt, all while your station is completely out of operation. The total cost, including lost revenue during the closure period, can easily reach ₦30–60 million or more for a multi-tank station.

Non-excavation underground tank repair changes this equation entirely. Using advanced internal lining and structural rehabilitation technologies, tanks can be repaired, sealed, and returned to service, without breaking a single square metre of your forecourt concrete.

Chess-T Group's underground works division delivers non-excavation tank repair services for filling stations across Nigeria, using international-standard materials and techniques that restore tank integrity and extend service life by 15–20 years.

Industry Overview: The Scale of Tank Failure in Nigeria

Nigeria's filling station sector contains a significant number of underground storage tanks that are at or beyond their design service life. The risk factors that drive tank deterioration in Nigerian conditions include:

Age of Infrastructure: A large portion of filling station USTs currently in operation were installed in the 1980s and 1990s. Single-wall steel tanks from this era were installed without cathodic protection, modern coating systems, or secondary containment, and are now deteriorating.

Electrochemical Corrosion: Steel underground tanks corrode through electrochemical reactions with the surrounding soil, particularly in the acidic soils common across the Niger Delta region. Without cathodic protection, this process accelerates significantly in moist conditions.

Physical Damage: Historical flooding, heavy vehicle loading across the tank field area, and inadequate backfill material during original installation can cause physical deformation of tank walls or fittings.

Fitting Failure: Many tank failures occur not in the tank body itself but in the fittings, fill ports, dip tube connections, vent connections, and product lines, where corrosion or mechanical failure creates leak paths.

The consequence of these failure mechanisms is a growing backlog of tanks that need intervention but where owners are deterred from the cost and disruption of full excavation.

Non-Excavation Repair Technologies

Chess-T Group deploys the following non-excavation repair technologies, selected based on the specific failure mode, tank material, and operational requirements of each site:

1.    Internal Structural Lining (Primary Method)

A structural resin lining system is applied to the interior of the tank from the access manway. The process involves:

       Product removal and tank cleaning to remove residues and vapours

       Surface preparation through mechanical abrasion

       Application of multiple coats of structural epoxy or glass-reinforced plastic (GRP) resin

       Curing under controlled conditions

       Final inspection including holiday testing and thickness measurement

The cured lining seals all pinholes and corrosion points in the existing steel tank wall, creates a chemically resistant interior surface, and provides structural reinforcement that extends tank service life by 15–20 years. The lining is chemically compatible with PMS, AGO, and other petroleum products.

2.    Flexible Liner Installation (Bladder Lining)

For tanks with more significant corrosion where epoxy application is not suitable, a flexible plastic bladder is installed inside the existing tank. The bladder provides a completely new product-contact surface within the existing tank structure.

3.    Cathodic Protection System Installation

Where the primary failure mode is external corrosion, a cathodic protection system is installed through existing tank access points. Sacrificial magnesium or zinc anodes, or an impressed current system, is configured to halt the electrochemical corrosion process without tank excavation.

4.    Piping Replacement

Product piping between tanks and dispensers is frequently the source of product release, particularly for older rigid steel piping systems. Flexible secondary-containment piping is installed through existing pipe trenches or directional micro-trenching to replace corroded rigid lines.

5.    Fitting Replacement

Tank fill ports, dip tube fittings, and product outlet fittings can be replaced or resealed without full tank excavation in most configurations.


The Non-Excavation Repair Process

Chess-T Group's non-excavation tank repair programme follows a structured process:

Pre-Works Assessment: A comprehensive inspection of the tank interior using CCTV camera and thickness measurement tools establishes the exact condition and identifies all areas requiring repair.

Product Removal and Gas-Free Certification: The tank is emptied and purged to achieve gas-free status. A certified gas-free certificate is issued before entry work commences.

Interior Cleaning: High-pressure cleaning removes residual product, sludge, scale, and corrosion products from the tank interior. Cleaning material is disposed of in accordance with environmental regulations.

Surface Preparation: The interior surface is mechanically prepared to the required cleanliness and profile for the selected lining system.

Lining Application: The structural lining system is applied in accordance with manufacturer specifications, with each coat allowed to achieve minimum cure before the next application.

Quality Inspection: The completed lining is inspected for thickness uniformity and holiday tested (spark tested) to confirm that no pinholes or thin spots remain in the applied coating.

Commissioning: The tank is approved for return to service, and a lining certificate is issued for NMDPRA compliance purposes.

Regulatory Acceptance of Non-Excavation Repairs

Non-excavation tank repair is an internationally recognised remediation methodology accepted by petroleum regulatory authorities in the United Kingdom, United States, Europe, and South Africa, markets with significantly more developed regulatory frameworks than Nigeria.

Chess-T Group works with NMDPRA's technical staff to ensure that our non-excavation repair programme documentation meets the regulatory standards required for the station's operating licence to remain valid following the intervention.

Documentation provided includes:

       Pre-works tank inspection report

       Gas-free certificate

       Lining material technical data sheets and compatibility certificates

       Application quality control records

       Post-application holiday test certificate

       Completed lining warranty certificate

Cost Comparison: Non-Excavation vs Full Excavation

The financial case for non-excavation repair is compelling:

Full excavation and tank replacement for a typical Nigerian filling station (3–6 tanks):

       Civil works (breaking forecourt, excavation, backfill, reinstatement): ₦15–30 million

       New tank supply and installation: ₦8–20 million

       Lost revenue during closure (estimated 3–6 weeks): ₦5–15 million

       NMDPRA re-approval: Additional time and cost

Total estimated cost: ₦28–65 million+

Non-excavation internal lining for the same 3–6 tanks:

       Tank cleaning and preparation: ₦2–4 million

       Lining application: ₦8–18 million

       Station downtime: Minimal (often less than 7 days total for all tanks)

Total estimated cost: ₦10–22 million

The typical saving is between ₦18 million and ₦43 million — plus the value of weeks of uninterrupted trading that would otherwise be lost.

Frequently Asked Questions

Q: Is non-excavation repair as reliable as full tank replacement?

A: When executed correctly using appropriate materials and application standards, internal lining provides 15–20 years of additional service life, comparable to a new tank installation in many cases.

Q: Can all types of underground tanks be repaired without excavation?

A: Most steel and fibreglass underground tanks can be repaired through non-excavation techniques. The most important limiting factor is tank access for interior working; tanks with very small manway openings may not be accessible for lining application.

Q: Does the tank need to be taken completely out of service during repair?

A: Yes. The tank to be repaired must be emptied, gas-freed, and taken out of service for the duration of the repair works. However, other tanks on the station can continue to operate throughout the process.

Q: How long does a non-excavation repair take per tank?

A: Typically 3–7 days per tank depending on the tank size, condition severity, and selected lining system.

Conclusion

Non-excavation underground tank repair is the smart, economical alternative to full excavation that Nigerian filling station operators have been waiting for. It restores tank integrity, extends service life, eliminates product loss risk, and does so at a fraction of the cost of traditional tank replacement — without the devastating operational disruption of full forecourt excavation.

If your station has ageing underground tanks showing signs of deterioration — unexplained inventory losses, corrosion around fittings, monitoring well product presence — contact Chess-T Group before you face an emergency that forces the most expensive option.

Why Choose Chess-T Group Ltd

Chess-T Group is Nigeria's specialist in non-excavation underground tank repair:

       Internal tank inspection and condition assessment

       Gas-free certification and environmental compliance

       Structural epoxy and GRP lining application

       Flexible bladder lining systems

       Cathodic protection installation

       Product piping replacement

       Full regulatory documentation package

       NMDPRA compliance support

We repair tanks without breaking your business.

 

Planning a filling station project, LPG plant, automation upgrade, compliance registration, bulk fuel supply arrangement, real estate development, or outdoor advertising campaign? Chess-T Group Ltd provides professional end-to-end solutions across Nigeria.

Phone: 08143449981  |  08188076267

Website: chesstgroup.com.ng

Email: chesstgroup@gmail.com  |  info@chesstgroup.com.ng

Follow @chesstgroupltd on Instagram, Facebook, LinkedIn, X and TikTok.

Chess-T Group Ltd  —  Building Perfection

Chess-T Group Mid-Year Review 2026: Building Perfection Across Nigeria's Energy, Real Estate, and Technology Sectors

 

Introduction

As June 2026 draws to a close and the first half of the year enters the books, Chess-T Group Ltd pauses to reflect on a year that has been defined by growth, execution, and the deepening of our commitment to delivering professional excellence across every sector we serve.

From the Niger Delta to the Federal Capital Territory, from downstream petroleum infrastructure to premium real estate and enterprise technology, Chess-T Group's teams in Warri, Port Harcourt, and Abuja have served clients across an expanding portfolio of professional disciplines, and delivered on the promise that is at the heart of everything we do: Building Perfection.

This mid-year review offers both a reflection on 2026's first half and a forward-looking statement of our capabilities, our commitments, and our offer to every Nigerian investor, entrepreneur, and enterprise leader who has not yet engaged with us.

2026 H1: A Year of Delivery and Growth

The first half of 2026 has seen Chess-T Group deepen its engagement across all four of its core service divisions:

Energy Infrastructure Division:

We have executed filling station construction and modernisation projects across Delta State, Rivers State, and the FCT, delivering projects that combine NMDPRA-compliant construction with integrated automation from the foundation up.

Our ePump automation platform has been deployed across a growing portfolio of filling stations, with clients consistently reporting 70–90% reductions in unaccounted losses within the first quarter of operation. The ePump dashboard now covers stations from Warri to Abuja, demonstrating the platform's scalability across Nigeria's geography.

Our ATG installation programme has assessed and remediated underground tank leak conditions at multiple stations across the Niger Delta, protecting clients from the regulatory and environmental consequences of undetected underground contamination.

LPG plant construction projects have progressed through regulatory approval and civil works phases, extending our growing portfolio of gas infrastructure assets across the South-South region.

Real Estate Division:

Chess-T Group's real estate practice has served clients across Abuja's premium districts, Life Camp, Asokoro, and Maitama, and across Port Harcourt's GRA corridors and Trans-Amadi industrial estate.

Title perfection services have transformed undocumented property holdings into legally secure, commercially bankable assets for clients across Rivers State, Delta State, and the FCT.

Architectural visualisation projects have provided investors and developers with compelling 3D representations of development concepts, enabling investment decisions and client communication before a single brick is laid.

Business Consultancy Division:

CAC registration, ISO 9001 management system implementation, NMDPRA compliance auditing, and regulatory permit management services have served clients from first-time entrepreneurs to established operators across Nigeria's downstream and professional services sectors.

NIMASA and PENCOM compliance support has helped maritime and employer clients navigate regulatory requirements that carry significant financial penalties for non-compliance.

Technology and Media Division:

Our ICT infrastructure projects have provided Nigerian enterprises with the digital foundations they need to operate efficiently, manage risk, and scale confidently.

RPA implementations have delivered measurable efficiency improvements for professional services clients, automating repetitive administrative processes and freeing staff for higher-value activities.

The ePump platform continues to evolve, with new analytics capabilities and multi-site management features added in Q2 2026 that significantly enhance the management intelligence available to multi-station operators.


Our Commitment: Professional Standards in Every Engagement

Chess-T Group's positioning in the Nigerian professional services market is built on a commitment to standards that distinguish us from the broader market:

Technical Excellence: Our engineers, consultants, and advisors hold professional qualifications in their disciplines and maintain continuing professional development to stay current with evolving standards and best practices.

Regulatory Competence: We know the regulatory frameworks we work within — NMDPRA, CAC, FCTA, Rivers State and Delta State regulatory bodies — in the specific operational detail that translates into efficient, compliant outcomes for clients.

Commercial Integrity: We provide advice that is in our clients' interests, not in the interests of our supply relationships. Our fee-based consultancy model ensures that our recommendations are genuinely independent.

Delivery Follow-Through: Many Nigerian professional service providers excel at winning engagements and struggle with delivery. Chess-T Group's client relationships are built on the delivery experience — what we do after the engagement begins, not just the quality of our proposal.

Long-Term Partnership: Our most valued client relationships are long-term — clients who have engaged us across multiple projects and disciplines over multiple years. Building these relationships requires consistent performance across every engagement.

Chess-T Group's Service Portfolio: A Complete Capability Overview

As we enter the second half of 2026, Chess-T Group's service portfolio spans the following capabilities:

Energy Infrastructure:

       Filling station construction (turnkey)

       Filling station modernisation and upgrade

       LPG plant construction and commissioning

       CNG plant construction and commissioning

       Petroleum storage infrastructure

       Underground tank leak detection

       Non-excavation underground tank repair

       ATG system supply, installation, and maintenance

       ePump automation platform

       Filling station preventive maintenance

Real Estate:

       Property brokerage (residential and commercial)

       Real estate investment advisory

       Title perfection and documentation

       Property valuation

       Architectural visualisation (3D/10D and animation)

       Post-acquisition property management

Business Consultancy:

       CAC business registration

       NMDPRA compliance auditing

       NMDPRA licence applications and renewals

       ISO 9001 management system consultancy

       NIMASA, PENCOM, and NSITF permits

       Business plan development

       Investment feasibility studies

Technology and Media:

       ICT infrastructure design and implementation

       Business process automation (RPA)

       ePump dashboard and remote monitoring

       CCTV and security systems

       Digital transformation advisory

       Multimedia production and corporate presentations

Outdoor Advertising:

       Billboard structure development

       LED digital billboard supply and installation

       Advertising sales and client management

       Ground lease advisory for landowners

Looking Forward: H2 2026 and Beyond

The second half of 2026 offers significant growth opportunities across every sector in which Chess-T Group operates:

Energy Sector: Nigeria's continued downstream sector growth, the accelerating CNG adoption programme, and the ongoing need for filling station automation and compliance upgrading will drive strong demand for our energy infrastructure and consultancy services.

Real Estate: The Abuja and Port Harcourt premium property markets continue to attract domestic and international investment. Our real estate practice is positioned to serve this demand with the market access, documentation expertise, and professional rigour that sophisticated property transactions require.

Technology: Nigeria's accelerating digital transformation creates growing demand for ICT infrastructure, automation, and the ePump smart station platform as operators across sectors recognise the competitive advantage that technology enables.

Geographic Expansion: Chess-T Group's three-office model — Warri, Port Harcourt, Abuja — provides a strong geographic foundation. We continue to evaluate expansion opportunities in Benin City, Kano, and Lagos to extend our coverage of Nigeria's key commercial markets.

Client Testimonial Focus

The measure of Chess-T Group's performance is the satisfaction and success of our clients. We are proud of the relationships we have built with filling station operators who have seen their profitability transform through ePump automation, with real estate investors who have acquired legally secure premium properties through our advisory and documentation services, and with business owners who have built their enterprise foundations through our CAC and compliance services.

These relationships drive everything we do, because at Chess-T Group, building perfection means building outcomes that our clients can be proud of, for years and decades after our engagement concludes.

Frequently Asked Questions

Q: How do I engage Chess-T Group for a project?

A: Contact us through any of our channels- phone, email, or our website- and our business development team will arrange an initial consultation to understand your requirements and recommend the appropriate service.

Q: Does Chess-T Group operate outside the Niger Delta and Abuja?

A: Our primary operating bases are Warri, Port Harcourt, and Abuja, with project capability across Nigeria. For projects in other regions, we establish appropriate project-specific delivery arrangements.

Q: How does Chess-T Group price its services?

A: Our service pricing depends on the nature and scope of each engagement. We provide transparent fee proposals after an initial consultation and do not charge for initial project discussions.

Q: Does Chess-T Group work with individual investors as well as corporate clients?

A: Absolutely. Chess-T Group serves individual investors, small business owners, medium enterprises, and large corporates. Our service is scaled to the client's needs and project requirements.

Conclusion

June 30, 2026 marks the halfway point of a year in which Chess-T Group has continued to live its founding mission: delivering professional excellence across every engagement, building lasting client relationships, and contributing to the development of Nigeria's energy, real estate, and technology infrastructure.

As H2 2026 begins, Chess-T Group is positioned with the capability, the experience, the team, and the commitment to serve Nigerian investors, operators, and enterprises with the quality of professional service that the market has come to associate with our name.

Building Perfection. In everything we do.

Why Choose Chess-T Group Ltd

Chess-T Group Ltd, Nigeria's multi-sector professional services and engineering firm.

Offices in Warri | Port Harcourt | Abuja

Services spanning:

       Energy Infrastructure (Filling Stations, LPG, CNG, Automation, ATG)

       Real Estate (Brokerage, Title Perfection, Architectural Visualisation)

       Business Consultancy (CAC, NMDPRA, ISO, Permits)

       Technology and Media (ICT, RPA, ePump, Digital Transformation)

       Outdoor Advertising (Billboard Development and Management)

RC 903532 | NCC Class Licence No: CL/CYB/004/20 | IMC: FIMC ABJ. 5740.22

Building Perfection

 Planning a filling station project, LPG plant, automation upgrade, compliance registration, bulk fuel supply arrangement, real estate development, or outdoor advertising campaign? Chess-T Group Ltd provides professional end-to-end solutions across Nigeria.

Phone: 08143449981  |  08188076267

Website: chesstgroup.com.ng

Email: chesstgroup@gmail.com  |  info@chesstgroup.com.ng

Follow @chesstgroupltd on Instagram, Facebook, LinkedIn, X and TikTok.

Chess-T Group Ltd  —  Building Perfection


 

Oil and Gas Consultancy in Nigeria: How Professional Advisory Protects and Accelerates Downstream Investment

 

Introduction

Nigeria's petroleum sector offers extraordinary commercial opportunities, and equally extraordinary complexity. Regulatory frameworks that run to hundreds of pages, licensing processes that span multiple agencies, technical standards that carry serious safety and compliance implications, and market dynamics driven by global commodity prices and domestic policy decisions create an environment where investment without expert guidance is a high-risk proposition.

Professional oil and gas consultancy provides the expertise, relationships, and strategic clarity that transform this complexity from a barrier into a managed challenge.

Chess-T Group Ltd's oil and gas consultancy division serves investors, operators, and entrepreneurs across Nigeria's downstream petroleum sector, from individuals investing in their first filling station to established operators expanding their infrastructure portfolio. Our consultancy practice combines regulatory expertise, technical knowledge, and commercial insight to deliver advice that is practical, actionable, and commercially sound.

Industry Overview: The Nigerian Downstream Sector

Nigeria's downstream petroleum sector underwent its most significant structural change in decades with the passage of the Petroleum Industry Act (PIA) 2021 and the subsequent establishment of the NMDPRA as the primary regulatory authority.

Key structural features of the downstream sector in 2026:

Deregulation: PMS pricing is now market-determined. This has increased price volatility but also created opportunities for efficient operators to compete effectively.

Regulatory Consolidation: The consolidation of regulatory functions into the NMDPRA has simplified the regulatory interface for downstream operators, from a primary authority rather than the previous multi-agency fragmentation.

Dangote Refinery Impact: Domestic refinery production is progressively reducing import dependency, changing supply economics and logistics for filling station operators.

CNG and LPG Expansion: Alternative fuel infrastructure is growing rapidly, creating new business lines adjacent to traditional petroleum retail.

Technology Adoption: Automation, digital payments, and remote monitoring are becoming competitive differentiators rather than exceptions.

Compliance Intensification: NMDPRA enforcement activity has increased significantly, raising the compliance cost and risk for operators who do not manage their regulatory obligations proactively



Key Consultancy Services for Downstream Investors

Chess-T Group's oil and gas consultancy services cover the full lifecycle of downstream petroleum investment:

1.    Investment Feasibility Studies

Before committing capital to any petroleum infrastructure project, filling station, LPG plant, CNG facility, or petroleum storage terminal, a professional feasibility study quantifies the commercial viability, identifies key risks, and provides the financial basis for investment decision-making.

2.    Regulatory Strategy and Licensing Management

Chess-T Group advises clients on the optimal regulatory pathway for their specific project, manages the documentation preparation and submission process, and maintains the regulatory relationships that support efficient processing.

3.    Technical Due Diligence

For investors acquiring existing petroleum retail assets, Chess-T Group conducts technical due diligence: assessing infrastructure condition, compliance status, equipment integrity, and operational performance against the commercial claims of the vendor.

4.    Business Plan Development

Professional business plans for petroleum sector investments, developed to the standard required by financial institutions for loan applications and by NMDPRA for certain licence categories.

5.    Supply Chain Advisory

Guidance on product supply sourcing, supply agreement structuring, logistics management, and working capital optimisation for petroleum product traders and retailers.

6.    Operational Improvement Consulting

Performance improvement advisory for existing stations and petroleum operations, targeting profitability enhancement, compliance improvement, and operational efficiency.

7.    Staff Training and Certification

Training programmes for filling station staff on safety procedures, dispenser operation, ATG management, and customer service, aligned with NMDPRA requirements.

Why Independent Consultancy Matters

Many investors in Nigeria's petroleum sector rely on the same companies that sell them equipment or products to advise them on investment decisions. This creates obvious conflicts of interest.

Chess-T Group's consultancy practice operates on a fee basis that is independent of equipment supply, product supply, or construction contracts, enabling us to provide advice that is genuinely aligned with the client's interests rather than any supply relationship.

When we advise a client on ATG system selection, we do so based on the technical merits of available options, not on which supplier pays us the best commission. When we advise on supply chain arrangements, we do so based on what is best for our client's cost position and supply security, not on which marketer offers us the best referral arrangement.

This independence is particularly valuable for investors making large capital commitments in a sector where poor advice can be extremely costly.

The Value of Local Knowledge in Nigerian Oil and Gas Consultancy

Nigeria's petroleum sector has characteristics that make local market knowledge an essential component of effective consultancy:

Regulatory Relationships: The efficiency of regulatory processing, whether for licence applications, inspection scheduling, or compliance resolution, is strongly influenced by professional relationships with NMDPRA zonal offices. These relationships are built over years of consistent professional engagement.

Market Intelligence: The Nigerian petroleum market is opaque in ways that make real-time market intelligence, on product pricing trends, supply availability, regulatory enforcement priorities, and competitive dynamics, extremely valuable and not publicly available.

Local Supply Chain: The quality and reliability of petroleum logistics providers, equipment suppliers, and construction contractors in specific Nigerian regions is knowledge that only comes from years of working in those markets.

Community and Landowner Dynamics: Many petroleum infrastructure projects require navigation of community and landowner relationships that are specific to particular localities. Experience with these dynamics significantly reduces project execution risk.

Case Study: Typical Consultancy Engagement

A typical Chess-T Group oil and gas consultancy engagement might proceed as follows:

Engagement: A client approaches Chess-T Group with interest in building a filling station on a site they have identified in Warri.

Phase 1 — Feasibility: Chess-T Group conducts a traffic count, catchment analysis, site assessment, and financial model. The study recommends proceeding with a 4-pump configuration rather than the initially planned 6-pump layout based on traffic data.

Phase 2 — Regulatory Management: Chess-T Group prepares and submits the NMDPRA siting and approval application, manages the environmental assessment process, and obtains town planning approval.

Phase 3 — Technical Oversight: During construction, Chess-T Group's engineers conduct quality assurance inspections at key stages to confirm that the construction contractor is building to specification.

Phase 4 — Commissioning Support: Chess-T Group manages the NMDPRA pre-commissioning inspection and assists with obtaining the retail licence.

Phase 5 — Operational Launch: Chess-T Group advises on supply sourcing, staff recruitment and training, and the ePump automation installation.

The client launches with regulatory confidence, technical quality assurance, and operational capability that a self-managed project rarely achieves.

Frequently Asked Questions

Q: Does Chess-T Group work with international investors in Nigerian oil and gas?

A: Yes. Chess-T Group has advised international clients entering the Nigerian downstream sector on regulatory requirements, investment structuring, joint venture considerations, and local partner selection.

Q: What is the typical fee structure for Chess-T Group consultancy?

A: Consultancy fees are structured based on the scope and duration of the engagement, fixed fees for defined projects such as feasibility studies, retainer arrangements for ongoing regulatory management, and stage-payment structures for multi-phase development support.

Q: Can Chess-T Group provide consultancy support for upstream oil and gas?

A: Chess-T Group's primary expertise is in the midstream and downstream sectors. For upstream matters requiring reservoir engineering or production licence advisory, we collaborate with upstream-specialist partners.

Conclusion

Professional oil and gas consultancy in Nigeria is not a luxury for large corporations, it is a practical necessity for any investor making significant capital commitments in a complex, regulated, and operationally challenging sector.

The cost of good consultancy is a small fraction of the cost of poor investment decisions, regulatory penalties, or construction failures that inadequate advice allows.

Chess-T Group is the downstream petroleum consultancy partner that Nigerian investors trust.

Why Choose Chess-T Group Ltd

Chess-T Group's oil and gas consultancy services include:

       Investment feasibility studies

       Regulatory strategy and licensing management

       Technical due diligence on petroleum assets

       Business plan development

       Supply chain advisory

       Operational improvement consulting

       Staff training and certification

       Multi-sector expertise across construction, technology, and real estate

We bring knowledge, relationships, and integrity to every client engagement.

 Planning a filling station project, LPG plant, automation upgrade, compliance registration, bulk fuel supply arrangement, real estate development, or outdoor advertising campaign? Chess-T Group Ltd provides professional end-to-end solutions across Nigeria.

Phone: 08143449981  |  08188076267

Website: chesstgroup.com.ng

Email: chesstgroup@gmail.com  |  info@chesstgroup.com.ng

Follow @chesstgroupltd on Instagram, Facebook, LinkedIn, X and TikTok.

Chess-T Group Ltd  —  Building Perfection